SOP for air flow pattern visual test

1.0 PURPOSE: To lay down the Procedure for Air flow Pattern visual test. 2.0 SCOPE: This procedure applies for Air flow Pattern visual test at (Company name). 3.0 DEFINITIONS: Nil. 4.0 RESPONSIBILITY: 4.1 Engineering personnel

Read More »

SOP for integrity test of HEPA filters

1.0 PURPOSE: To lay down the Procedure for Integrity test of HEPA Filters. 2.0 SCOPE: This procedure applies for Integrity test of HEPA Filters at (Company name). 3.0 DEFINITIONS: Nil. 4.0 RESPONSIBILITY: 4.1 Engineering personnel

Read More »

Procedure for HVAC duct cleaning and leak test

1.0 PURPOSE: To lay down the Procedure for HVAC Duct cleaning and leak Test. 2.0 SCOPE: This procedure applies for HVAC Duct cleaning and leak Test at (Company name). 3.0 DEFINITIONS: Nil. 4.0 RESPONSIBILITY: 4.1

Read More »

SOP for electrical safety

1.0 PURPOSE: To lay down the Procedure for electrical safety guidelines while working on equipment’s connected by electrical power supply to avoid electrical accident and ensure personal safety. 2.0 SCOPE: This procedure for electrical safety

Read More »

Procedure for integrity testing of vent filter

1.0 PURPOSE: To define the procedure for integrity testing of vent filter by Bubble point test. 2.0 SCOPE: This procedure for integrity testing of vent filter is applicable at (Company name). 3.0 DEFINITION: Not Applicable.

Read More »

Procedure for Cleaning of water tanks

1.0 PURPOSE: To define the procedure for cleaning of water tanks used in purified water generation system. 2.0 SCOPE: This procedure for cleaning of water tanks is applicable to water tanks which are being used

Read More »

Procedure for cleaning of RO membrane

1.0 PURPOSE: To lay down the procedure for cleaning of RO membrane. 2.0 SCOPE: This procedure for cleaning of RO membrane is applicable to RO system at (Company name). 3.0 DEFINITION: Nil 4.0 RESPONSIBILITY: 4.1

Read More »

Operating Procedure of Chilled Water System

1.0 PURPOSE: To define the operating procedure of chilled water system. 2.0 SCOPE: The SOP for Operating Procedure of Chilled Water System is applicable to chilled water system at (Company name). 3.0 DEFINITION: Chiller Water

Read More »

Procedure for hydrostatic test for pipe lines

1.0 PURPOSE: To lay down the Procedure for Hydrostatic test for pipe lines. 2.0 SCOPE: This procedure applies for Hydrostatic test for all the MS, SS, PP and GI pipe lines (Company name). 3.0 DEFINITIONS:

Read More »

Procedure for calibration of dosing pumps

1.0 PURPOSE: To lay down the Procedure for Calibration of Dosing Pumps. 2.0 SCOPE: Procedure for Calibration of Dosing Pumps is applicable to all the Dosing Pumps related to the water plant at (Company name).

Read More »